Concord Hospital Infrastructure Upgrades

Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs

Project Overview

As part of this effort, Yeaton identified and implemented projects that converted constant volume air handling system to variable air volume, replaced steam pre-heat with better controlled glycol/water solution pre-heat, and incorporated return air at existing 100% ventilation air handling systems where permissible by current healthcare ventilation codes. Yeaton Associates, Inc. has also assisted Concord Hospital with infrastructure upgrade planning, including the replacement of 10 major air handling units with multiple-fan, high-efficiency units. The results of these measures include increased energy and operating efficiency, clarity around hospital infrastructure and a tangible reduction in operating costs for the hospital.

Facility Size

600,000+ Square Feet

Location

Yeaton Services

Yeaton provided mechanical, electrical, plumbing and fire protection engineering services for ongoing infrastructure improvement projects.